Laserfiche WebLink
Stage 1A Partial Final Closure February 2006 <br /> Forward Landfill Project No.021605.06 <br /> ® 7.0 CONCLUSION <br /> Construction of the closure components of the Stage lA Partial Final Closure <br /> (see Figure 1) were completed in October 2005. Based on our observations and <br /> testing during the construction of the above referenced portion of the Stage lA <br /> cover system at the Forward Landfill, it is Vector's professional judgment that <br /> the construction was completed in general accordance with the project plans <br /> and specifications, CQA manual, applicable regulations, and approved design <br /> modifications. <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -19- <br />