TIECTOR <br />ENGINEERING, INC. <br />0 DALY CONSTRUCTION] REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward Landfill <br />021605.06 <br />3 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />August 22, 2005 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather: <br />CQA Technician: <br />On site native light brown silty Clay <br />Hot, clear and breezy <br />Ken Davila <br />nyuiPmnm on SIM I <br />1-Sheepsfoot compactor, 2- water trucks, 1- D6 dozer, 6-627 scrapers, 1- 140 blade, 1- 320 excavator <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the location listed above. Guinn <br />Construction completed the clearing and grubbing of the west slope of the existing trash and worked south <br />to north. The scrapers removed topsoil from the area north of the North Fork of South Little John's Creek <br />and stockpiling it to the east of the cut area. The excavator dug pits four feet deep along the west and north <br />*toe of slope to check for the presence of refuse. None was encountered in any of the excavations. Minor <br />amounts of fill were placed along the west toe of slope to make a road and to level the area for fill traffic. <br />The dozer and sheepsfoot worked there. <br />The leak location personnel worked on the north and west areas of the FU -05 cell floor. <br />LIM <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Reviewed By: e <br />