Laserfiche WebLink
I IE TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 43 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 14, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),high 60's to low 100's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued placement of the Operations Layer over 8 oz. geotextile; work into the southeast portion of <br /> the upper area this a.m. <br /> 2. Continued excavation for the sump in the lower floor area subgrade. <br /> II. Testing <br /> 1. Monitored activities. <br /> III. Conversations <br /> • With Larry Simms, Gwinn Construction,re: Expect arrival of liner next Monday. <br /> Prepared Bye Reviewed By: G <br /> 1 of 1 4/23/03,Rev.0 <br />