Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 44 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 15, 2006 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, it. breeze(N ),high 60's to low 100's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. No activity other than loading belly dumps with soil for the French Camp Closure. <br /> II. Testing <br /> 1. Misc. sorting of paperwork. <br /> 10JI. Conversations <br /> • None. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />