Laserfiche WebLink
T/T TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. ReportSequence <br /> Forward WMU FU-06 02.1605.07 48 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 20, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), low 70's to 1OW100'S Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Surveyors shoot the floor subgrade in FU-06. <br /> 2. Finished excavation of the anchor trench across the south limit of FU-06. <br /> 3. GSE continued filling sand bags and off-loading deliveries of geosynthetics. <br /> Delivery summary: Truck load#l, 7/18/06 w/15 rolls SST 60-mil. <br /> ® Truck load#2, 7/18/06 w/15 rolls SST 60-mil. <br /> Truck load#3, 7/19/06 w/10 rolls Bentofix and 20 bags of bentonite. <br /> Truck load#4, 7/20/06 w/15 rolls SST 60-mil. <br /> Truck load#5, 7/20/06 w/11 rolls DST 60-mil. <br /> Truck load#6, 7/20/06 w/10 rolls Bentofix and 20 bags of bentonite. <br /> 4. A tractor and disc arrived today for clay work. <br /> II. Testing <br /> 1. Collected 3 samples of the LCRS Granular Drainage material placed atop FU-06 for laboratory <br /> conformance testing: Sample#2,NE area; sample #3, SE area; sample#4, SW area. The samples were <br /> expedited to Vector Engineering, Inc. by field lab. assistant Tom Brady. <br /> III. Conversations <br /> • Attended Construction Meeting: discussed schedule. <br /> • Expect about 3 days to do liner on berms in the FU-06 upper area. <br /> • Expect to start placement of clay liner next Monday. <br /> • Monte Christie w/Vector has provided a punch list for the completion of the FU-06 upper area. <br /> • Vector to coordinate with Gwinn during leak testing of the liner in the lower area of FU-06. <br /> • Vector to contact Bentofix to get certifications; all HDPE liner on site has certifications included <br /> with the delivery inventories. <br /> Prepared B Reviewed By: ,lf� <br /> 1 of 1 4/23/03,Rev.0 <br />