Y T77 <br /> v_r, TOR <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 47 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 19, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Mostly cloudy, It. breeze (NW), low 70's to low 100's IMikeStrobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor,water truck, excavator,rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued-finished grading the floor subgrade in FU-06. <br /> 2. Start-finished excavation of the anchor trench across the south limit of FU-06. <br /> 3. GSE starts filling sand bags. <br /> 4. Ten rolls of Bentofix arrived this morning. The material was off-loaded using a forklift. <br /> 5. A tractor and disc arrived today for clay work. <br /> II. Testing <br /> 1. Performed 9 FDT's in compacted Subgrade in the floor area,tests SG-84 through SG-93, all passed. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />