TOR <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 58 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 2, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), high 50's to mid 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn Construction continued placement of the Clay Liner in the lower area of WMU FU-06. <br /> 2. Continued/finished deployment filter geotextile and placement of the Granular Drainage materials <br /> along the inside of the berms in the northern portion of FU-06. <br /> 3. Restart placement of the Operations Layer in the Northern Portion. <br /> 10I. Testing <br /> 1. Performed 35 FDT's in compacted Clay Liner; tests CL-86 through CL-119, including retests CL- <br /> 111A and CL-113A. After reworking the failed areas all final test results either met or exceeded <br /> specification requirements. <br /> 2. Performed sand cone test SCCL-93. <br /> III. Conversations <br /> • None listed. <br /> Prepared y: Reviewed By: dA` <br /> 1 of 1 4/23/03,Rev. 0 <br />