I 7E <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 64 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 9, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),mid 50's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor completes excavation of the anchor trench across the top of the 5:1 slope, Southern Portion. <br /> 2. Contractor has set the temporary leachate tank in the SEC of the Northern Portion. <br /> 3. Contractor completes anchor trench backfill and placement of the Operations Layer soils on the north <br /> berm in the Northern Portion. <br /> �. Testing <br /> 1. Monitored activities as needed. <br /> 2. Continued laboratory testing on field samples. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: � � wvuuReviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />