Laserfiche WebLink
Elf <br /> FK ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 66 <br /> Location of Work: Client Or Manager Date: Day of The Week. <br /> Stockton Allied Waste August 11, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), mid 60's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor continued assembling the 18"HDPE Leachate pipe risers. <br /> 2. Continued detail work along the east liner limit in FU-05/tie-in to the FU-06 west limit. <br /> II. Testing <br /> ® 1. Monitored activities as needed. <br /> 2. Continued miscellaneous laboratory testing, data entry, etc. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />