TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 67 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 14,2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), low 60's to mid 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor continued assembling the 18" HDPE Leachate pipe risers. <br /> 2. Continued detail work along the east liner limit of FU-05 in the 5:1 slope area. <br /> Il. Testing <br /> 1. Monitored activities as needed. <br /> 2. Continued miscellaneous laboratory testing, data entry, etc. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., re: Some of the permeability tests of the clay <br /> liner are not meeting specification requirements; rework and resample at the following test <br /> locations: STCL-54, 64, 163, 168 and 169. Vector CQA will coordinate with contractor Larry <br /> Simms with Gwinn Construction to rework and resample Clay Liner soils as needed. <br /> • With Lochlin Caffey, Allied Waste, re: site visit. Discussed permeability testing, etc. Contractor <br /> will rework areas in question for resampling. Vector CQA expedite samples to the lab. <br /> -�, A A ffn fi 1 0 <br /> Prepared By: MLWI-C/ Reviewed By: !r,( <br /> 1 of 1 4/23/03,Rev.0 <br />