Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 69 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 16, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), high 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor installs two suction lysimeters within the sump floor area. <br /> 2. Continued welding HDPE pipes for the LCRS. <br /> II. Testing <br /> 1. Collected HDPE liner samples: single sided textured, roll -4247; and double sided textured, roll -6104. <br /> 2. Collected Bentofix sample from roll 55774. <br /> 3. Collected representative samples of Clay Liner and Operations soils for Direct Shear testing. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., re: Delivered soil and liner samples to Vector <br /> office. Introduce technician Janet Strobel to staff. Reviewed daily reports and data to date. <br /> Prepared B <br /> P Y Reviewed By: <br /> I of 1 4/23/03,Rev.0 <br />