Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 70 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 17, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), high 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Contractor secures and seals sample and suction lines attached to the two suction lysimeters in the <br /> sump floor area. <br /> 2. Continued moisture conditioning the surface of the Clay Liner in the floor area. <br /> :I. Testing <br /> 1. Monitored activities as needed. <br /> 2. Continued soils testing in on-site soils laboratory. <br /> 3. Continued data entry of completed soils tests. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., re: Delivered soil and liner samples to Vector <br /> office. Introduce technician Janet Strobel to staff. Reviewed daily reports and data to date. <br /> : <br /> Pre ared B : Reviewed B <br /> P Y Y <br /> 1 of 1 4/23/03,Rev.0 <br />