Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 72 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 21, 2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), mid 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued moisture conditioning the surface of the Clay Liner in the floor area. <br /> 2. Gwinn Construction off loads deliveries of Geocomposite w/roll certifications included. <br /> Geosynthetics received today: Truck load#20 w/24 rolls. <br /> Truck load# 21 w/24 rolls and 3 bags of ties. <br /> ® Truck load#22 w/19 rolls and 3 bags of ties. <br /> Truck load#23 w/18 rolls and 2 bags of ties. <br /> Truck load#24 w/24 rolls. <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Continued data entry and review of field-test results. <br /> 3. Made back-up copies of miscellaneous field data; mailed copies to Vector Engineering, Inc. <br /> 4. Faxed roll numbers and certification data to Vector Engineering, Inc. on the 5 loads of Geocomposite <br /> received today. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />