Laserfiche WebLink
, -E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 74 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 23, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, it. breeze (NW), low 60's to low 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued moisture conditioning the surface of the Clay Liner in the floor area of FU-06. <br /> 2. Gwinn Construction stakes the east liner limit on the 5:1 slope in the FU-06 southern portion. <br /> II. Testing <br /> 1. Monitored activities, continued data entry, etc. <br /> ® Faxed inventories and certifications of geosynthetics received yesterday to Vector for review. <br /> III. Conversations <br /> • Attended Construction Meeting; no issues. GSE to be on site tomorrow to start liner components on <br /> the 5:1 slope area. <br /> Prepare By Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />