Laserfiche WebLink
17E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 75 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 24, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), mid 50's to mid 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued moisture conditioning the surface of the Clay Liner in the floor area of FU-06. <br /> 2. GSE on site. Start setting-up to deploy on slopes, make more sandbags, etc. <br /> 3. Tom Brady with Vector Engineering, Inc. delivers tensiometer and "bone" (coupon) cutter. <br /> II. Testing <br /> 1. Monitored activities, continued data entry, etc. <br /> 2. Assisted GSE with copy of the Plans, etc. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: L, <br /> 1 of 1 4/23/03,Rev.0 <br />