Laserfiche WebLink
17E TOR <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 82 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 1, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), low 60's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completed deployment of 60-mil HDPE single side textured on the 5:1 slope area, liner panels P-58 <br /> through P-62: area = 25,442 square feet. Total coverage to date = 230,796 square feet. (Vector <br /> measurements) <br /> 2. Gwinn Construction continued moisture conditioning the floor area Clay Liner. <br /> toesting <br /> Monitored activities; all logs, as-built, etc. <br /> 2. Located and tested 60-mil HDPE Destructive Samples DS-17 and DS-21. All samples passed. <br /> III. Conversations <br /> • None listed. <br /> Prepared By• Reviewed By: <br /> I of 1 4/23/03,Rev.0 <br />