TIT 'TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. ReportSequence <br /> Forward WMU FU-06 02.1605.07 81 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste August 31, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils I Clear, It. breeze (NW), low 60's to mid 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued deployment of 60-mil HDPE single side textured on the 5:1 slope area, liner panels P-50 <br /> through P-57: area = 48,554 square feet. Total coverage to date = 205,353 square feet. (Vector <br /> measurements) <br /> 2. Bentofix deployed today=63,750 square feet. Total Bentofix deployed to date=231,654 square feet. <br /> 3. Gwinn Construction continued moisture conditioning the floor area Clay Liner. <br /> II. Testing <br /> 1. Monitored activities; all logs, as-built etc. <br /> 2. Located and tested 60-mil HDPE Destructive Samples DS-15 and DS-16. Both samples passed. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> y F <br /> 1 of 1 4/23/03,Rev. 0 <br />