Laserfiche WebLink
VE <br /> ENGINEERING, INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 88 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 9, 2006 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), mid 50's to low 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued deployment of 60-mil HDPE double-side textured on the central floor area, panels P-93 <br /> through P-113. Area= 104,586 square feet. Total to date=421,594 square feet. <br /> 2. Gwinn continued moisture conditioning all exposed Clay Liner soils. <br /> I Testing <br /> Monitored all activities; continued liner deployment, trial welds, seam/pressure testing and repair logs. <br /> Located HDPE liner Destructive Samples DS-34 through DS-51. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />