ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. ReportSequence <br /> Forward WMU FU-06 02.1605.07 90 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 12, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), low 60's to low 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued and finished deployment of 60-mil HDPE double-side textured on the east floor area, <br /> panels P-125 through P-128. Area=28,754 square feet. Total to date = 589,006 square feet. <br /> 2. GSE continued repairs and vacuum testing. <br /> 3. Vector Engineering, Inc. continued leak testing the HDPE liner in the west floor area. <br /> esting <br /> Monitored all activities; continued liner deployment,trial welds, seam/pressure testing and repair logs. <br /> 2. Located, removed and tested HDPE liner Destructive Samples DS-50 through DS-59. All passed. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: The east edge of HDPE liner is about 18" short <br /> of the staked liner limit. Will this be alright? The plans show this termination covered by plywood <br /> for tie-in next year. Monte said he would check with Lochlin Caffee with Allied...should be O.K. <br /> Prepared'By. Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />