W 717 <br /> v_r, TOR <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 92 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 14, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (N ), high 50's to mid 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completes rock removal,minor repairs and vacuum testing HDPE on the east floor area. <br /> 2. GSE continued deployment of 12 oz. Geotextile Cushion over HDPE along the entire east side of the floor <br /> area. 65,700 square feet deployed today. <br /> 3. Vector Engineering, Inc. continued leak testing the HDPE liner in the east-central floor area. <br /> esting <br /> Monitored all activities as needed; continued misc. data to seam and pressure-testing logs. <br /> 2. Performed "Final Walk" over HDPE liner throughout the central and east-side areas; GSE given approval <br /> to deploy 12 oz. Geotextile cushion over any HDPE that has been leak tested by Vector. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Technician assistant Janet Strobel will de-mob <br /> today. With Larry Simms, Gwinn Construction, Re: You will have the entire east-side of the module <br /> ready by Monday for placement of LCRS gravel/Granular Drainage Material. <br /> Prepared By Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />