Laserfiche WebLink
117 <br /> E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 93 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 15, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), high 50's to mid 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued deployment of 12 oz. Geotextile Cushion over HDPE in the area north of the sump, east of <br /> the centerline. 23 rolls textile were deployed, = 103,500 square feet. Total geotextile deployed to date = <br /> 259,606 square feet. <br /> 2. Vector Engineering, Inc. completed leak testing the HDPE liner on the floor areas. No leaks were found to <br /> this technician's knowledge. <br /> II. Testing <br /> 1. Monitored all activities as needed; completed misc. data to seam and pressure-testing logs. Continued data <br /> entry; completed Repair Log to R-64. <br /> 2. GSE provided their draft As-built map for the HDPE liner deployed in FU-06,panels P-1 through P-128. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Misc. discussions regarding design and <br /> specifications. There is no Geocomposite anywhere on the south slope. The riser pipe for the <br /> primary LCRS system rests directly on the south slope with no indentation in the subgrade as on the <br /> plans. Two layers of Cushion Geotextile (12 oz.) will be placed under the primary LCRS riser, as <br /> designed, when Gwinn Construction sets the pipe. <br /> Prepared B Reviewed By: <br /> I of 1 4/23/03,Rev.0 <br />