Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 99 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 22,2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Mostly clear, v. windy (N),high 50's to low 801s Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn installs the east-side perforated LCRS pipe over Filter Geotextile; bedded and covered with Coarse <br /> Drainage material and eventually wrapped in Filter Geotextile. <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Continued data entry on the Seam/Air Test Logs. <br /> III. Conversations <br /> • None listed. <br /> Prepared Reviewed By: <br /> Air <br /> I of 1 4/23/03,Rev.0 <br />