Laserfiche WebLink
V <br /> C <br /> ENGINEERING,INC. <br /> 0 DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 100 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 25, 2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),mid 50's to low 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn continued placement of the I' thick lift of Granular Drainage Material over Cushion Geotextile in <br /> the east area of FU-06. Filter Geotextile is then deployed over the gravel, using a 2' overlap and heat <br /> fusion to seal the edge of textile, and covered with a 2' thick lift of Operations Material. <br /> II. Testing <br /> Monitored activities. <br /> Completed data entry on the Seam/Air Test Logs. Continued details on data, put all geosynthetics in <br /> binder, etc. <br /> III. Conversations <br /> • With Monte Christie, Vector Engineering, Inc., Re: Up date of activities, schedule, etc. <br /> Prepared By Reviewed By: <br /> I of 1 4/23/03,Rev. 0 <br />