Laserfiche WebLink
117 <br /> ECT <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 102 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste September 27, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),mid 50's to high 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn continued placement of the l' thick lift of Granular Drainage Material over Cushion Geotextile, <br /> followed by deployment of 8 oz. Filter geotextile and the Operations Layer soils. <br /> 2. Continued placement of the Coarse Gravel over Cushion Geotextile in the sump. <br /> II. Testing <br /> 0 Monitored activities. <br /> Completed data entry for the Destructive Logs. <br /> 3. Start data entry on the Trial Welds. <br /> IIl. Conversations <br /> • None listed. <br /> Prepared By?!n4P <br /> Reviewed By: <br /> —t <br /> 1 of 1 4/23/03,Rev. 0 <br />