Laserfiche WebLink
I ZE 'TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. 7ofThe <br /> ort Sequence <br /> Forward WMU FU-06 02.1605.07 103 <br /> Location of Work: Client Or Manager Date: 7Day Week: <br /> Stockton Allied Waste September 28, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), mid 50's to low 80's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor,2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn continued placement of the 1' thick lift of Granular Drainage Material over Cushion Geotextile, <br /> followed by deployment of 8 oz. Filter geotextile and the Operations Layer soils. Working on the west side <br /> of the centerline today. <br /> 2. Gwinn set the primary LCRS riser pipe in the sump. <br /> 3. Complete placement of the Coarse Gravel over Cushion Geotextile in the sump. <br /> 4. Gwinn installs the west-side perforated LCRS pipe in Coarse Gravel and wrapped in Boz. Filter Geotextile. <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Completed data entry on the Trial Weld Logs. <br /> III. Conversations <br /> • None listed. <br /> Prepared B <br /> p Y Reviewed By: � <br /> 1 of 1 4/23/03,Rev. 0 <br />