Laserfiche WebLink
TOR <br /> ENGINEERING,INC. <br /> ® DAILY C ONS TRUC TIONFIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 108 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 5, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Rain a.m., cloudy, breeze (SE),mid 50's to high 60's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor,2 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn completed removal of the Temporary Berm at the south end of the Northern Portion of FU-06. <br /> 2. Vector Engineering, Inc. starts Leak Testing the floor area of FU-06. <br /> II. Testing <br /> 1. Monitored activities. <br /> is <br /> Continued data entry: continued Clay Liner Density Test Logs. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />