Laserfiche WebLink
W TV V 'TOR <br /> ENGINEERING, INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 118 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 19, 2006 Thursday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, breeze (SE), low 40's to low 70's Mike Strobel <br /> "Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 1 water trucks, excavator, rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Gwinn continued and finished placement of 6" thick lift of Granular Drainage Material over Cushion <br /> Geotextile atop the 5:1 slope area. <br /> 2. Gwinn deploys 8 oz. Filter Geotextile over Granular Drainage Material and starts placement of the <br /> Operations Layer soils atop the 5:1 slope area. <br /> esting <br /> Monitored activities. <br /> 2. Complete Daily Reports. <br /> 3. Load field laboratory equipment, prepare to demobilize today. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />