Laserfiche WebLink
VE TOR <br /> IV ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 117 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste October 18, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, breeze (SE), low 40's to low 70's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 1 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE completed minor repairs and all vacuum testing on the 60-mil HDPE liner deployed atop the 5:1 <br /> slope. GSE does miscellaneous clean-up and repaired a small hole in the primary liner above the sump. <br /> 2. GSE started and completed deployment of the 12 oz. Cushion Geotextile over 60-mil HDPE atop the 5:1 <br /> slope; approximately 37,680 ft . <br /> 3. GSE does miscellaneous clean-up and repaired a small hole in the primary liner above the sump <br /> 4. Gwinn started placement of 6" thick lift of Granular Drainage Material over Cushion Geotextile atop the <br /> 5:1 slope area. <br /> 5. Gwinn completed pushing the Operations Layer soils up the south slope. <br /> Il. Testing <br /> 1. Performed "Final Walk" with GSE over HDPE liner deployed atop the 5:1 slope; approval given to deploy <br /> 12 oz. Cushion Geotextile over HDPE liner here. <br /> 2. Exchanged copies of Subgrade Acceptance with GSE for liner atop the 5:1 slope, panels P-129 through P- <br /> 161, approximately 57,872 ft2. <br /> 3. Performed 3 FDT's in compacted Earthfill Soils placed for the east termination berm in the floor area. <br /> Tests SG-98, 99 and 100 all indicated passing results. <br /> III. Conversations <br /> • None listed. <br /> Prepared B <br /> P Y: ' Reviewed By: !2� <br /> I of 1 4/23/03, Rev.0 <br />