Laserfiche WebLink
17E APR <br /> ENGINEERING, INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture P/F Remarks/retest <br /> Date or or or No. (pcfl Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. %) (Rc % c <br /> 7/26/06 CL-1 Lift 1 CLP-1 117.6 13.4 128.6 22.1 105.3 90 90 +2 to+6 P <br /> 7/26/06 CL-2 Lift 1 CLP-1 117.6 13.4 126.6 19.3 106.1 90 90 +2 to+6 P <br /> 7/26/06 CL-3 Lift 1 CLP-1 117.6 13.4 124.5 18.2 105.3 90 90 +2 to+6 P <br /> 7/26/06 CL-4 Lift 1 CLP-1 117.6 13.4 124.2 17.9 105.3 90 90 +2 to+6 P <br /> 7/26/06 CL-5 Lift 1 CLP-1 117.6 13.4 126.3 18.8 106.3 90 90 +2 to+6 P SC,STCL-5A,B <br /> 7/27/06 CL-6 Lift 1 CLP-1 117.6 13.4 125.6 18.3 106.2 90 90 +2 to+6 P <br /> 7/27/06 CL-7 Lift 1 CLP-1 117.6 13.4 128.7 20.9 108.3 92 90 +2 to+6 P <br /> 7/27/06 CL-8 Lift 1 CLP-1 117.6 13.4 124.8 17.3 105.9 90 90 +2 to+6 P <br /> 7/27/06 CL-9 Lift 1 CLP-1 117.6 13.4 125.1 18.5 105.6 90 90 +2 to+6 P <br /> 7/27/06 CLA 0 Lift 1 CLP-1 117.6 13.4 127.7 17.8 108.4 92 90 +2 to+6 P STCL-10A,B <br /> 7/27/06 CL-11 Lift 1 CLP-1 117.6 13.4 125.6 19.0 105.5 90 90 +2 to+6 P <br /> 7/27/06 CL-12 Lift 1 CLP-1 117.6 13.4 126.5 20.1 105.3 90 90 +2 to+6 P <br /> 7/27/06 CL-13 Lift 1 CLP-1 117.6 13.4 128.3 20.2 106.7 91 90 +2 to+6 P <br /> 7/27/06 CL-14 Lift 1 CLP-1 117.6 13.4 125.5 18.9 105.6 90 90 +2 to+6 P <br /> 7/27/06 CL-15 Lift 1 CLP-1 117.6 13.4 129.6 21.7 106.4 90 90 +2 to+6 P <br /> 7/27/06 CL-16 Lift 1 CLP-1 117.6 13.4 126.2 19.1 106.0 90 90 +2 to+6 P <br /> 7/27/06 CL-17 Lift 1 CLP-1 117.6 13.4 125.3 17.1 107.0 91 90 +2 to+6 P <br /> 7/27/06 CL-18 Lift 1 CLP-1 117.6 13.4 117.8 22.0 96.5 82 90 +2 to+6 F <br /> 7/27/06 CL-19 Lift 1 CLP-1 117.6 13.4 121.8 19.4 102.0 87 90 +2 to+6 F <br /> 7/27/06 CL-20 Lift 1 CLP-1 117.6 13.4 126.0 18.6 106.2 90 90 +2 to+6 P <br /> 7/28/06 CL-18A Lift 1 CLP-1 117.6 13.4 126.3 18.2 106.9 91 90 +2 to+6 P Retest O.K. <br /> 7/28/06 CL-19A Lift 1 CLP-1 117.6 13.4 125.9 17.4 107.2 91 90 +2 to+6 P Retest O.K. <br /> 7/28/06 CL-21 Lift 1 CLP-1 117.6 13.4 125.5 18.5 105.9 90 f +2 to+6 P <br /> 7/28/06 CL-22 Lift 1 CLP-1 117.6 13.4 -123.7 1 17.3 105.5 90 90 +2 to+6 P <br /> 7/28/06 CL-23 Lift 1 CLP-1 117.6 13.4 126.1 1 19.6 105.4 90 90 +2 to+6 P <br /> 4/23/03, Rev.0 Page 1 of 7 <br />