Laserfiche WebLink
17E *R <br /> ENGINEERING, INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture PIF Remarks/retest <br /> Date or or or No. (pcfl Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c <br /> 7/28/06 CL-24 Lift 1 CLP-1 117.6 13.4 126.3 18.2 106.9 91 90 +2 to+6 P <br /> 7/28/06 CL-25 Lift 1 CLP-1 117.6 13.4 125.2 18.6 105.6 90 90 +2 to+6 P <br /> 7/28/06 CL-26 Lift 1 CLP-1 117.6 . 13.4 127.6 20.3 106.1 90 90 +2 to+6 P SCCL-26 <br /> 7/28/06 CL-27 Lift 1 CLP-1 117.6 1 13.4 126.8 20.1 1 105.6 90 90 +2 to+6 P <br /> 7/28/06 CL-28 Lift 1 CLP-1 117.6 13.4 125.9 17.7 107.0 91 90 +2 to+6 P <br /> 7/28/06 CL-29 Lift 1 CLP-1 117.6 13.4 126.2 18.9 106.1 90 90 +2 to+6 P <br /> 7/28/06 CL-30 Lift 1 CLP-1 117.6 13.4 125.8 18.7 106.0 90 90 +2 to+6 P <br /> 7/28/06 CL-31 Lift 1 CLP-1 117.6 13.4 128.1 19.6 107.0 91 90 +2 to+6 P <br /> 7/28/06 CL-32 Lift 1 CLP-1 117.6 13.4 126.7 16.5 108.7 92 90 +2 to+6 P <br /> 7/28/06 CL-33 Lift 1 CLP-1 117.6 13.4 128.2 19.4 107.3 91 90 +2 to+6 P <br /> 7/28/06 CL-34 Lift 1 CLP-1 117.6 13.4 125.5 19.0 105.5 90 90 +2 to+6 P <br /> 7/28/06 CL-35 Lift 1 CLP-1 117.6 13.4 126.1 19.8 105.3 90 90 +2 to+6 P <br /> 7/28/06 CL-36 Lift 1 CLP-1 117.6 13.4 125.7 18.2 106.3 90 90 +2 to+6 P <br /> 7/28/06 CL-37 Lift 1 CLP-1 117.6 13.4 127.2 18.9 107.0 91 90 +2 to+6 P <br /> 7/28/06 CL-38 Lift 1 CLP-1 117.6 13.4 126.5 20.1 105.3 90 90 +2 to+6 P <br /> 7/28/06 CL-39 Lift 1 CLP-1 117.6 13.4 126.2 18.9 106.1 90 90 +2 to+6 P <br /> 7/28/06 CL-40 Lift 1 CLP-1 117.6 13.4 127.3 18.2 107.7 92 90 +2 to+6 P <br /> 7/28/06 CL-41 Lift 1 CLP-1 117.6 13.4 124.3 16.9 107.2 91 90 +2 to+6 F <br /> 7/28/06 CL-42 Lift 1 CLP-1 117.6 13.4 125.2 18.0 106.1 90 90 +2 to+6 F <br /> 7/31/06 CL-43 Lift 2 CLP-1 117.6 13.4 125.6 19.1 105.5 90 90 +2 to+6 P STCL-43A,B <br /> 7/31/06 CL-44 Lift 2 CLP-1 117.6 13.4 126.8 18.6 106.8 91 90 +2 to+6 P SCCL-44 <br /> 7/31/06 CL-45 Lift 2 CLP-1 117.6 13.4 128.7 18.1 109.0 93 90 +2 to+6 P <br /> 7/31/06 CL-46 Lift 2 CLP-1 117.6 13.4 128.4 18.7 108.2 92 90 +2 to+6 P <br /> 7/31/06 CL-47 Lift 2 CLP-1 117.6 13.4 127.5 20.0 106.3 90 90 +2 to+6 P <br /> 7/31/06 CL-48 Lift 2 CLP-1 117.6 13.4 128.7 19.3 107.8 92 90 +2 to+6 P <br /> 4/23/03, Rev.0 Page 2 of 7 <br />