Laserfiche WebLink
V 7Z7 <br /> *R <br /> ENGINEERING,INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture P/F Remarks/retest <br /> Date or or or No. (pcfl Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c <br /> 8/1/06 CL-74 Lift 2 CLP-1 117.6 13.4 125.7 18.3 106.3 90 90 +2 to+6 P <br /> 8/1/06 CL-75 Lift 2 CLP-1 117.6 13.4 127.4 21.9 105.6 90 90 +2 to+6 P <br /> 8/1/06 CL-76 Lift 2 CLP-1 117.6 13.4 126.1 19.3 105.7 90 90 +2 to+6 P <br /> 8/1/06 CL-77 Lift 2 CLP-1 117.6 13.4 128.2 20.9 1 105.9 90 90 +2 to+6 P <br /> 8/1/06 CL-78 Lift 2 CLP-1 117.6 13.4 126.2 19.1 106.0 90 90 +2 to+6 P <br /> 8/1/06 CL-79 Lift 2 CLP-1 117.6 13.4 128.6 18.9 108.2 92 90 +2 to+6 P <br /> 8/1/06 CL-80 Lift 2 CLP-1 117.6 13.4 128.0 21.0 105.8 90 90 +2 to+6 P <br /> 8/1/06 CL-81 Lift 2 CLP-1 117.6 13.4 125.6 18.1 106.4 90 90 +2 to+6 P <br /> 8/1/06 CL-82 Lift 2 CLP-1 117.6 13.4 126.3 17.7 107.3 91 90 +2 to+6 P <br /> 8/1/06 CL-83 Lift 2 CLP-1 117.6 13.4 124.7 17.9 105.8 90 90 +2 to+6 P <br /> 8/1/06 CL-84 Lift 2 CLP-1 117.6 13.4 126.1 19.7 105.3 90 90 +2 to+6 P SCOL-84 <br /> 8/1/06 CL-85 Lift 2 CLP-1 117.6 13.4 126.1 16.9 107.8 92 90 +2 to+6 P STCL-85A,B <br /> 8/1/06 CL-86 Lift 2 CLP-1 117.6 13.4 127.2 17.1 108.6 92 90 +2 to+6 P <br /> 8/2/06 CL-87 Lift 3 CLP-1 117.6 13.4 126.2 18.8 106.2 90 90 +2 to+6 P <br /> 8/2/06 CL-88 Lift 3 CLP-1 117.6 13.4 126.9 19.3 106.4 90 90 +2 to+6 P <br /> 8/2/06 CL-89 Lift 3 CLP-1 117.6 13.4 125.9 18.3 106.4 90 90 +2 to+6 P <br /> 8/2/06 CL-90 Lift 3 CLP-1 117.6 13.4 127.1 18.4 107.3 91 90 +2 to+6 P <br /> 8/2/06 CL-91 Lift 3 CLP-1 117.6 13.4 128.7 18.6 108.5 92 90 +2 to+6 F <br /> 8/2/06 CL-92 Lift 3 CLP-1 117.6 13.4 128.5 17.9 109.0 93 90 +2 to+6 F <br /> 8/2/06 CL-93 Lift 3 CLP-1 117.6 13.4 130.0 18.6 109.5 93 90 +2 to+6 P SCCL-93 <br /> 8/2/06 CL-94 Lift 3 CLP-1 117.6 13.4 131.5 18.8 110.6 94 90 +2 to+6 P <br /> 8/2/06 CL-95 Lift 3 CLP-1 117.6 13.4 130.1 21.2 107.3 91 90 +2 to+6 P <br /> 8/2/06 CL-96 Lift 3 CLP-1 117.6 13.4 129.2 18.5 109.0 93 90 +2 to+6 P <br /> 8/2/06 CL-97 Lift 3 CLP-1 117.6 13.4 131.5 18.9 110.5 94 90 +2 to+6 P <br /> 8/2/06 1 CL-98 Lift 3 CLP-1 117.6 13.4 126.4 18.0 107.1 91 90 +2 to+6 P <br /> 4/23/03, Rev. 0 Page 4 of 7 <br />