Laserfiche WebLink
'F/7E *R <br /> ENGINEERING,INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture P/F Remarks/retest <br /> Date or or or No. (pcf) Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c <br /> 7/31/06 CL-49 Lift 2 CLP-1 117.6 13.4 129.6 18.4 109.4 93 90 +2 to+6 P <br /> 7/31/06 CL-50 Lift 2 CLP-1 117.6 13.4 129.7 18.7 109.2 93 90 +2 to+6 P <br /> 7/31/06 CL-51 Lift 2 CLP-1 117.6 13.4 129.5 20.2 107.7 92 90 +2 to+6 P <br /> 7/31/06 CL-52 Lift 2 CLP-1 117.6 13.4 125.3 17.9 106.2 90 90 +2 to+6 P <br /> 7/31/06 CL-53 Lift 2 CLP-1 117.6 13.4 129.7 21.5 106.7 91 90 +2 to+6 P <br /> 8/1/06 CL-54 Lift 2 CLP-1 117.6 13.4 126.3 19.1 106.0 90 90 +2 to+6 P STCL-54A,B <br /> 8/1/06 CL-55 Lift 2 CLP-1 117.6 13.4 125.9 18.6 106.2 90 90 +2 to+6 P <br /> 8/1/06 CL-56 Lift 2 CLP-1 117.6 13.4 129.7 17.6 110.3 94 90 +2 to+6 P <br /> 8/1/06 CL-57 Lift 2 CLP-1 117.6 13.4 129.5 18.2 109.5 93 90 +2 to+6 P <br /> 8/1/06 CL-58 Lift 2 CLP-1 117.6 13.4 128.7 17.9 109.2 93 90 +2 to+6 P <br /> 8/1/06 CL-59 Lift 2 CLP-1 117.6 13.4 131.8 16.5 113.1 96 90 +2 to+6 P <br /> 8/1/06 CL-60 Lift 2 CLP-1 117.6 13.4 128.1 19.8 106.9 91 90 +2 to+6 P SCCL-60 <br /> 8/1/06 CL-61 Lift 2 CLP-1 117.6 13.4 128.5 21.5 105.7 90 90 +2 to+6 P <br /> 8/1/06 CL-62 Lift 2 CLP-1 117.6 13.4 127.7 20.5 106.0 90 90 +2 to+6 P <br /> 8/1/06 CL-63 Lift 2 CLP-1 117.6 13.4 128.9 21.5 106.1 90 90 +2 to+6 P <br /> 8/1/06 CL-64 Lift 2 CLP-1 117.6 13.4 127.6 18.7 107.5 91 90 +2 to+6 P STCL-64A,B <br /> 8/1/06 CL-65 Lift 2 CLP-1 117.6 13.4 127.9 20.8 105.9 90 90 +2 to+6 P <br /> 8/1/06 CL-66 Lift 2 CLP-1 117.6 13.4 126.2 18.2 106.8 91 90 +2 to+6 F <br /> 8/1/06 CL-67 Lift 2 CLP-1 117.6 13.4 126.3 17.9 107.1 91 90 +2 to+6 F <br /> 8/1/06 CL-68 Lift 2 CLP-1 117.6 13.4 127.6 18.2 108.0 92 90 +2 to+6 P <br /> 8/1/06 CL-69 Lift 2 CLP-1 117.6 13.4 125.5 17.5 106.8 91 90 +2 to+6 P <br /> 8/1/06 CL-70 Lift 2 CLP-1 117.6 13.4 124.0 17.4 105.6 90 90 +2 to+6 P <br /> 8/1/06 CL-71 Lift 2 CLP-1 117.6 13.4 126.3 18.1 106.9 91 90 +2 to+6 P <br /> 8//l//06 CL-72 Lift 2 CLP-1 117.6 13.4 124.5 17.6 105.9 90 90 +2 to+6 P <br /> 8/1/06 1 CL-73 Lift 2 CLP-1 1 117.6 13.4 127.2_J 18.4 1 107.4 91 90 +2 to+6 P SCCL-73 <br /> 4/23/03, Rev.0 Page 3 of 7 <br />