Laserfiche WebLink
0 *R <br /> rENGMEERNG,INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification- <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture P/F Remarks/retest <br /> Date or or or No. (pcfl Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c % <br /> 8/3/06 CL-123 Lift 3 CLP-1 117.6 13.4 127.7 21.2 105.3 90 90 +2 to+6 P <br /> 8/3/06 CL-124 Lift 3 "'CLP-1 117.6 13.4 126.9 18.8 106.8 91 90 +2 to+6 P <br /> 8/3/06 CL-125 Lift 3 CLP-1 117.6 13.4 129.7 20.5 107.6 91 90 +2 to+6 P <br /> 8/3/06 CL-126 Lift 3 CLP-1 117.6 13.4 129.2 20.3 107.4 91 90 +2 to+6 P <br /> 8/3/06 CL-127 Lift 3 CLP-1 117.6 13.4 127.2 20.4 105.5 90 90 +2 to+6 P <br /> 8/3/06 CL-128 Lift 3 CLP-1 117.6 13.4 126.9 18.1 107.5 91 90 +2 to+6 P <br /> 8/3/06 CL-129 Lift 3 CLP-1 117.6 13.4 127.3 19.2 106.8 91 90 +2 to+6 P <br /> 8/3/06 CL-130 Lift 3 CLP-1 117.6 13.4 125.4 18.6 105.7 90 90 +2 to+6 P <br /> 8/4/06 CL-131 Lift 4 CLP-1 117.6 13.4 129.2 17.7 109.8 93 90 +2 to+6 P <br /> 8/4/06 CL-132 Lift 4 CLP-1 117.6 13.4 132.2 17.7 111.5 95 90 +2 to+6 P <br /> 8/4/06 CL-133 Lift 4 CLP-1 117.6 13.4 129.3 18.6 109.0 93 90 +2 to+6 P <br /> 8/4/06 CL-134 Lift 4 CLP-1 117.6 13.4 127.8 18.1 108.2 92 90 +2 to+6 P <br /> 8/4/06 CLA 35 Lift 4 CLP-1 117.6 13.4 129.0 18.5 108.9 93 90 +2 to+6 P <br /> 8/4/06 CL-136 Lift 4 CLP-1 117.6 13.4 131.7 21.1 108.6 92 90 +2 to+6 P STCL-136A,B <br /> 8/4/06 CL-137 Lift 4 CLP-1 117.6 13.4 129.2 18.7 108.8 93 90 +2 to+6 P <br /> 8/4/06 CLA 38 Lift 4 CLP-1 117.6 13.4 128.7 19.3 107.9 92 90 +2 to+6 P <br /> 8/4/06 CL-139 Lift 4 CLP-1 117.6 13.4 130.8 18.3 110.6 94 90 +2 to+6 P <br /> 8/4/06 CL-140 Lift 4 CLP-1 117.6 13.4 128.9 19.4 108.0 92 90 +2 to+6 F <br /> 8/4/06 CL-141 Lift 4 CLP-1 117.6 13.4 127.6 19.9 106.4 90 90 +2 to+6 F <br /> 8/4/06 CL-142 Lift 4 CLP-1 117.6 13.4 129.3 19.6 108.1 92 90 +2 to+6 P <br /> 8/4/06 CL-143 Lift 4 CLP-1 117.6 13.4 127.6 20.1 106.9 91 90 +2 to+6 P SC,STCL-143A,B <br /> 8/4/06 CL-144 Lift 4 CLP-1 117.6 13.4 127.4 19.0 106.5 91 90 +2 to+6 P <br /> 8/4/06 CL-145 Lift 4 CLP-1 117.6 13.4 127.2 20.1 105.9 90 90 +2 to+6 P <br /> 8/4/06 CL-146 Lift 4 CLP-1 117.6 13.4 127.6 20.4 106.0 90 90 +2 to+6 P <br /> 8/4/06 CL-147 Lift 4 CLP-1 117.6 13.4 126.4 18.3 106.8 91 90 +2 to+6 P <br /> 4/23/03, Rev. 0 Page 6 of 7 <br />