Laserfiche WebLink
Y 7E MR <br /> ENGINEERING, INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Clay Liner Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DD max Optimum Wet Moisture Dry % % Moisture P/F Remarks/retest <br /> Date or or or No. (pcf) Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c <br /> 8/4/06 CL-148 Lift 3 CLP-1 117.6 13.4 125.6 18.9 105.6 90 90 +2 to+6 P <br /> 8/4/06 CL-149 Lift 3 CLP-1 117.6 13.4 127.0 19.3 106.5 91 90 +2 to+6 P <br /> 8/4/06 CLA 50 Lift 3 CLP-1 117.6 13.4 128.3 19.4 107.4 91 90 +2 to+6 P SC,STCL-150A,B <br /> 8/5/06 CLA 51 Lift 3 CLP-1 117.6 1 13.4 125.7 19.1 105.5 90 90 +2 to+6 P <br /> 8/5/06 CL-152 Lift 3 CLP-1 117.6 13.4 126.9 19.5 106.2 90 90 +2 to+6 P <br /> 8/5/06 CLA 53 Lift 3 CLP-1 117.6 13.4 127.6 19.1 107.1 91 90 +2 to+6 P <br /> 8/5/06 CL-154 Lift 3 CLP-1 117.6 13.4 125.6 18.9 105.6 90 90 +2 to+6 P <br /> 8/5/06 CLA 55 Lift 3 CLP-1 117.6 13.4 124.6 17.7 105.9 90 90 +2 to+6 P SCCL-155 <br /> 8/5/06 CLA 56 Lift 4 CLP-1 117.6 13.4 126.6 19.0 106.4 90 90 +2 to+6 P <br /> 8/5/06 CL-157 Lift 4 CLP-1 117.6 13.4 126.6 18.7 106.7 91 90 +2 to+6 P <br /> 8/5/06 CL-158 Lift 4 CLP-1 117.6 13.4 127.9 21.5 105.3 90 90 +2 to+6 P STCL-158A,B <br /> 8/5/06 CL-159 Lift 4 CLP-1 117.6 13.4 126.0 18.3 106.5 91 90 +2 to+6 P <br /> 8/5/06 CL-160 Lift 4 CLP-1 117.6 13.4 126.9 19.6 106.1 90 90 +2 to+6 P <br /> 8/5/06 CLA 61 Lift 4 CLP-1 117.6 13.4 126.6 20.0 105.5 90 90 +2 to+6 P <br /> 8/5/06 CL-162 Lift 4 CLP-1 117.6 13.4 129.4 20.7 107.2 91 90 +2 to+6 P <br /> 8/5/06 CLA 63 Lift 4 CLP-1 117.6 13.4 128.9 22.3 105.4 90 90 +2 to+6 P SC,STCL-163A,B <br /> 8/5/06 CL-164 Lift 4 CLP-1 117.6 13.4 129.1 22.3 105.5 90 90 +2 to+6 P <br /> 8/5/06 CL-165 Lift 4 CLP-1 117.6 13.4 128.9 21.1 106.3 90 90 +2 to+6 P <br /> 8/5/06 CL-166 Lift 4 CLP-1 117.6 13.4 126.8 20.1 105.6 90 90 +2 to+6 P <br /> 8/5/06 CL-167 Lift 4 CLP-1 117.6 13.4 124.5 18.0 105.5 90 90 +2 to+6 P <br /> 8/5/06 CL-168 Lift 4 CLP-1 117.6 13.4 125.6 19.0 105.6 90 90 +2 to+6 P STCL-168A,B <br /> 8/5/06 CL-169 Lift 4 CLP-1 117.6 13.4 128.5 21.4 105.8 90 90 +2 to+6 P STCL-169A,B <br /> 8/5/06 CL 170 Lift 4 CLP-1 117.6 13.4 127.3 20.8 105.4 90 90 +2 to+6 P <br /> 10/16/06 CL-171 FG CLP-1 117.6 13.4 124.5 16.7 106.7 91 90 +2 to+6 P clay plug trench <br /> 10/16/06 CLA 72 FG CLP-1 117.6 13.4 124.9 17.1 106.7 91 90 +2 to+6 P clay plug trench <br /> 4/23/03, Rev.0 Page 7 of 7 <br />