Laserfiche WebLink
y TV <br /> V Ed <br /> ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 28 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 21, 2006 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),high 60's to high 90's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor,water truck, excavator, rock truck, loader,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued excavation to make the south-end slope of FU-06. Soil materials are being placed and <br /> compacted in the floor area alongside the east limit of FU-06. <br /> 2. Completed installation of the 8 oz. geotextile, the 3" perforated pipes and filter gravel for the LCRS in <br /> the north half of FU-06. <br /> ® 3. Start deployment of the bottom geotextile along the Eastern Termination of FU-05. <br /> H. Testing <br /> 1. Monitored activities. <br /> III. Conversations <br /> • None listed. <br /> • Attended Construction Meeting. <br /> 0 ro, <br /> Prepared b i)�n - Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />