Laserfiche WebLink
W TV <br /> v i,, TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 27 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 20,2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), high 50's to mid 90's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator,rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued rough grading in the south east area of FU-06. <br /> 2. Continued excavation to make the south end of FU-06. Soil materials are being placed and compacted <br /> alongside the east limit of FU-06. <br /> 3. Start installation of the 8 oz. geotextile, the 3" perforated pipes and filter gravel for the LCRS in the <br /> north half of FU-06. <br /> 4. Yesterday, two trucks delivered 8 oz. geotextile: load#6 with 27 rolls, and load#7 with 20 rolls. <br /> II. Testing <br /> 1. Monitored activities. <br /> III. Conversations <br /> • None listed. <br /> Prepared By:, ,133WC. Reviewed By: fir! <br /> 1 of 1 4/23/03,Rev.0 <br />