Laserfiche WebLink
17EC'TOA <br />ENGINEERING, INC <br />C <br />DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />1 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 15, 2006 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />High clouds, It. breeze SE, 680 @ 0700 <br />Mike Strobel <br />r'yuipil lit vu zttc. I <br />2x637 scrapers, D6 dozer, 815 compactor, water truck <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Contractor widens compost pad area; removing wet soils and replacing with drier material from cut on <br />the east side of the compost pad. <br />2. Contractor starts construction of a ramp from the compost area to the top of FU -06 <br />II. Testing <br />0 1. None <br />III. Conversations <br />• Misc. discussion with Larry Simms w/Gwinn. <br />• Brian Fritzler w/Vector, re: Get with Ryan Nelson w/Gwinn to coordinate sampling from a <br />stockpile for a proposed clay borrow on `B" Street north of Arch Road. Expedite samples to the <br />Vector Engineering, Inc. <br />M <br />Reviewed By: Ale. <br />1 of 1 4/23/03, Rev. 0 <br />