Laserfiche WebLink
T/TCTOR <br />ENGINEERING, INC. <br />DAILY0 REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />2 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 16, 2006 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Cawinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />Clear, breezy, 90° 2.m. <br />Mike Strobel <br />Equipment on site: <br />2x637 scrapers, D6 dozer, 815 compactor, water truck <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued work on compost pad and ramp. <br />H. Testing <br />1. None <br />AWL Conversations <br />• None listed. <br />By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />