Laserfiche WebLink
VEECTOR <br />NClNEERM, INC. <br />REPORT0 DAILY CONSTRUCTION FIELD <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />4 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 18, 2006 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />Clear, breezy (NW), 90's p.m. <br />Michael Strobel <br />Equipment on site: <br />2x637 scrapers, D6 dozer, 815 compactor, water truck, 12G blade <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Start construction of temporary berms in the upper area of FU -06. Fill materials from the demolition of <br />the existing berm along the east side of FU -05. Scrapers place and compact thin 4"-6" loose lifts. <br />2. Continued/finished work on compost pad and ramp. <br />II. Testing <br />0 1. None <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Contractor will go to 10 hour days, Monday <br />through Thursday, with Friday a short day. <br />VIA <br />Reviewed By: /it 6 <br />1 of 1 4/23/03, Rev. 0 <br />