Laserfiche WebLink
17ECTOR <br />ENGINEERING INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />3 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 17, 2006 <br />Wednesday <br />General Contractor: <br />liner Contractor: <br />Project Engineer: <br />Reviewed By. <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />Scat. clouds, breezy (SW), high 60's to mid 90's. <br />Michael Strobel <br />Equipment on site: <br />2x637 scrapers, D6 dozer, 815 com actor, water truck <br />NOT" (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued work on compost pad and ramp. <br />2. Continued exposing east edge of the existing liner in FU -05 and removing of the temporary berm. <br />3. Continued stripping grasses from the existing landfill in the north half of FU -06. <br />II. Testing <br />0 1. None <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Discussed schedule and work to start with <br />placement of materials for the new temporary berms in FU -06. <br />LIM <br />Reviewed By: At 6 <br />1 of 1 4/23/03, Rev. 0 <br />