Laserfiche WebLink
V 777 -TOR <br />N Z -r <br />Wz J <br />Mz <br />EV <br />pr ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORI <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />10 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 26, 2006 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />Overcast, breezy, high 50's to mid 70's <br />Michael Strobel <br />r,quipment on site: <br />3 x 637 scrapers, D6 dozer, 815 compactor, water truck, 12G blade, excavator <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued placement and compaction of Subgrade Fill on the 5:1 slope area; working upper area this <br />a.m. <br />2. Continued detail work on the edge of liner on FU -06. <br />3. Detail berms in the upper area of FU -06 and along east liner limit in FU -05. <br />01. Testing <br />1. Pounded Subgrade Proctor sample SGP -2. <br />2. Performed 3 FDT's in compacted subgrade soils placed on the 5:1 slope, tests SG -19, 20 and 21all <br />passed. <br />3. Completed -200 wash on Subgrade Proctor sample SGP -2. <br />III. Conversations <br />• None listed. <br />Prepared <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />