Laserfiche WebLink
117 <br />ECTOA <br />IV ENGINEERING, INC <br />0 DALY CONSTRUCTION/ REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />13 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 1, 2006 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />L Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Stockpile, SWC FU -06 <br />Bcm . overcast, breezy p.m. NW, 60's to hi h 80's <br />Mike Strobel <br />Equipment on site: <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued construction of 4' fill on 5:1 area; at about 62' MSL this a.m. Material continues to be <br />collected from the "wedge" in the SWC of FU -06. <br />2. Continued loading black topsoils from east of the compost pad to the French Camp Closure. <br />11. Testing <br />1. Performed 9 FDT's, in compacted subgrade placed on the 5:1 slope; tests SG -26 through SG -33, <br />including retest SG -26A in an area needing additional effort. After retesting, all test results indicate <br />passing results. <br />III. Conversations <br />• Monte Christie, Vector engineer, re: Site visit. Check work in progress, test results to date. <br />Helped set up computer and printer. <br />Prepared By: <br />Reviewed By: 46 <br />1 of 1 4/23/03, Rev. 0 <br />