Laserfiche WebLink
I/TCTOA <br />ENGINEERING JN( <br />C <br />DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />14 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 2, 2006 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Stockpile, SWC FU -06 <br />Scat clouds, breezy (NW), 60's to high 80's <br />Mike Strobel <br />rqutpment on site: <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued/finished construction of 4' fill on 5:1 area. <br />2. Continued loading out black top -soils from east of the compost pad to the French Camp Closure. <br />II. Testing <br />1. Performed 7 FDT's, in compacted subgrade placed on the 5:1 slope; tests SG -34 through SG -40. <br />All tests indicate passing results. <br />2. Pounded +2% and +4% Proctor points on sample SG -3. Prepared +6% point for Monday, 6/5/06. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />