Laserfiche WebLink
VJECTOR <br />4 INC. <br />0 DALY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />16 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 6, 2006 <br />Tuesday <br />General Contractor: <br />liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />I CQA Technician: <br />Import <br />Clear a.m.-bcm . ovrest .m.,lt. breeze (NW), low 90's <br />1 Mike Strobel <br />Equipment on site: <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. The D6 dozer and 12G blade continued -finished minor trimming atop the fill placed on the 5:1 slope. <br />2. Continued loading out black top -soils from east of the compost pad to the French Camp Closure. <br />3. Contractor continued placing Subgrade fill on the east floor area of FU -06. <br />4. The "V" ditches for the LCRS piping have been cut into subgrade in the north area of FU -06. <br />Testing <br />1. Performed 5 FDT's in compacted subgrade being placed in the east floor of FU -06; tests SG -48 <br />through SG -52, including performing a Proctor check point with test CKPTSG-50. All tests passing. <br />2. Performed Liquid Limit on subgrade sample SG -1. <br />3. Completed Sieve Analysis on subgrade sample SG -3 with 58.9% minus 200 materials. <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Discussed decreasing the moisture content in the <br />subgrade fill material being placed in the east floor of FU -06. <br />Prepared By: <br />Reviewed By: ALL <br />1 of 1 4/23/03, Rev. 0 <br />