Laserfiche WebLink
FFTOR <br />ENGINEERING, 17V( <br />DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />15 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 5, 2006 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />Clear, It. breeze (NW), 60's to high 80's <br />Mike Strobel <br />Equipment on site: <br />3x637 scra ers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. The D6 dozer does minor trimming atop the fill placed on the 5:1 slope. <br />2. Continued loading out black top -soils from east of the compost pad to the French Camp Closure. <br />3. Contractor STARTS work on the floor in the SE area of FU -06 at about the 7' MSL elevation. Some <br />"wet" material was removed form here and replaced with "drier material from the SW floor area. <br />Testing <br />1. Performed 7 FDT's in compacted subgrade; tests SG -41, 42 and 43 in original ground in the SE floor <br />area and tests SG -44 through SG -47 at the top of the 5:1 slope. Tests SG -44 through SG -47 indicate <br />passing results; test results on SG -41, 42 and 43 pending Proctor compaction on new sample, SGP -4, <br />collected adjacent these tests today. <br />2. Results on Proctor sample SGP -3; 114.9 pcf @ 14.4% O.M.C. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: &Z <br />1 of 1 4/23/03, Rev. 0 <br />