Laserfiche WebLink
VIF-7 <br />ECTOR <br />NGINEERINC�INC. <br />0 DAILY CONSTRUCTIONI REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />23 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 14, 2006 <br />Wednesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description ofll Material: <br />Weather: <br />CQA Technician: <br />Import <br />Cloudy, breezy(W), high 50's to mid 80's <br />Mike Strobel <br />Equipment on site: <br />3x637 scra ers, D6 dozer, 815 com actor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. <br />Construction <br />1. Continued placement of Subgrade soils outside the side project area on the east side of FU -06 and <br />minor fill to finish grade on the east floor area. <br />2. Start cut at the south end of FU -06; material taken to east floor areas. <br />3. Start shaping the central floor area; material taken to east floor areas. <br />4. Contractor continued butt -fusion welding the 3" diameter perforated HDPE LCRS pipes. <br />0 I. <br />Testing <br />1. Performed 4 FDT's in compacted Subgrade; tests SG -70 through SG -73. All tests passed. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />