Laserfiche WebLink
jJECTOR <br />V ENGINEERING, INC. <br />L�F DAILY I •REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />24 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 15, 2006 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />Clear, breezy (NW), high 50's to high 80's <br />Mike Strobel <br />Equipment on site: I <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued placement of excess Subgrade soils outside the side project area on the east side of FU -06. <br />2. Continued grading subgrade in the central and west floor areas. <br />3. Continued the cut at the south end of FU -06; material taken to east floor areas. <br />H. Testing <br />1. Performed 3 EDT's in compacted Subgrade; tests SG -74 through SG -76. All tests passed. <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Has Vector Engineering, Inc. received the survey <br />taken on the upper area of FU -06? Larry wants to start installing the LCRS system. Brian said he <br />had not seen the survey. Brian and Larry were to discuss the matter. <br />Prepared By: <br />Reviewed By: AV <br />1 of 1 4/23/03, Rev. 0 <br />