Laserfiche WebLink
v.ujYcTox <br />GNC. <br />0 DAILY CONSTRUCTION FIELD O. <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />27 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 20, 2006 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />Clear, It. breeze (NW), high 50's to mid 90's <br />Mike Strobel <br />Equipment on site: <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued rough grading in the south east area of FU -06. <br />2. Continued excavation to make the south end of FU -06. Soil materials are being placed and compacted <br />alongside the east limit of FU -06. <br />3. Start installation of the 8 oz. geotextile, the 3" perforated pipes and filter gravel for the LCRS in the <br />north half of FU -06. <br />0 4. Yesterday, two trucks delivered 8 oz. geotextile: load #6 with 27 rolls, and load #7 with 20 rolls. <br />II. Testing <br />1. Monitored activities. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: g, <br />1 of 1 4/23/03, Rev. 0 <br />