VECTOR <br />ENGINEERING INC. <br />DAILY CONSTRUCTION I; REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />26 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 19, 2006 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />Clear, lt. breeze (NW), hi h 50's to low 90's <br />Mike Strobel <br />Equipment on site: I <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued rough grading in the south east area of FU -06. <br />2. Continued excavation to make the south end of FU -06. Soil materials being placed and compacted <br />outside the east limit of FU -06. <br />II. Testing <br />0 1. Took one FDT in compacted Subgrade in the east floor area of FU -06; test SG -77 passed. <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Has the survey of the north area of FU -06 been <br />reviewed? In a call to Monte Christie, Vector Engineering, Inc., Monte said he had not seen the <br />survey, but if Larry Simms felt comfortable he could start installation of the LCRS system here. <br />Prepared By: <br />Reviewed By: AtC <br />1 of 1 4/23/03, Rev. 0 <br />