VENGINEERINQ INC. <br />DAILY CONSTRUCTIONI REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />45 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />July 17, 2006 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwlnn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />Clear, It. breeze (NW), low 70's to mid 100's <br />Mike Strobel <br />Equipment on site: <br />4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued -finishing placement of the Operations Layer over 8 oz. geotextile in the southeast portion, of <br />the upper area of FU -06. <br />2. Start finish grading of the floor subgrade in FU -06; paddlewheel scraper and blade using GPS. <br />3. Started excavation of the lateral drainages to the sump in the lower floor area subgrade of FU -06. <br />4. Start trimming soils along the east side of FU -05 liner limit and detail subgrade along the liner limit at <br />the southwest corner/south slope of the FU -06 floor area. <br />05. GSE representative Ruben Altamirano on site to off load geosynthetics arriving o/a tomorrow. <br />II. Testing <br />1. Monitored activities. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />